Looking North at the footing excavation along column line 10.
Looking East at the storm line south of the engine room being installed.
Looking North, workers prepare rebar for the footing at the dock office and loading dock.
Looking Southeast at the cleanout for the 6″ storm line.
Looking North, the continuous footing along column line 12 is ready to be poured.
And the rain begins! Rain and high water table combine to make the site very saturated.
Footing K-10 is in the process of being poured. This was one of the footings on K-line that had to be repaired due to the wood piles encountered.
Extremely heavy rains move in, leading to three days of weather delays.