View looking South of the East stem wall of the building. Progress looks good!
Excavators working to chip out the existing storm line so that a new line can be installed.
Photo looking East down K Column line, footings have successfully been poured.
Photo of flowable fill over the transformer conduit at the engine room.
Recent Comments