Photo 6: Installation of Anchor bolts into Palisters.
Photo 5: Rebar and formwork looking good. Ready for Footings to be poured.
Photo 4: Spacers and Conduit being installed.
Photo 3: New Fire line, hydrant, and system stub being flushed per code requirements.
Photo 2: Pour completed at the engine room wall
Photo 1: Rebar and formwork for the concrete wall