photo 1

Backfilling the engine room.

photo 2

Asphalt being removed at the truck apron on the south side.

photo 3

All interior piers have been poured.

photo 4

TPO membrane installation around a column (to the condenser stand).

(Below)  Chuck McCarthy on the roof of the engine room. photo 6