Construction Progress Photos for week ending 09/26

View looking South of the East stem wall of the building.  Progress looks good!

Excavators working to chip out the existing storm line so that a new line can be installed.

Photo looking East down K Column line, footings have successfully been poured.

Photo of flowable fill over the transformer conduit at the engine room.

Chuck McCarthy Presenting at the NC Port Protein Meeting

Construction Progress Photos for week ending 9/19

Photo 6: Installation of Anchor bolts into Palisters.

Photo 5:  Rebar and formwork looking good.  Ready for Footings to be poured.

Photo 4:  Spacers and Conduit being installed.

Photo 3: New Fire line, hydrant, and system stub being flushed per code requirements.

Photo 2: Pour completed at the engine room wall

Photo 1:  Rebar and formwork for the concrete wall

 

Construction Progress Photos for week ending 09/12

First week of construction at the Port!

We poured the footers
West side footers

North side footers