Photo 1

The East wall of the office is being formed and prepped for pour later this week.

photo 2

Views of the site from the top of the engine room.  Top left shows the edge of the loading dock and the freezer, while the bottom right shows the loading dock area and the office on the far edge of the building.

photo 3

Handrail and grafting are being installed at the condenser stand.

photo 4

Storm line is being installed on the Northwest side of the site.